Extracurricular Practice Industrial Solutions and Environmental Treatments 378741
Publication date
Training project: Learning the management of the engineering department: Collaboration with project managers to train in the different tasks that a project consists of, from the conceptualization phase, purchase of equipment, installation and start-up of wastewater treatment plants. feedwater and industrial wastewater, anaerobic digestion and biogas and biomethane plants.
Title:
- Industrial Technology Engineering Degree
Duration: 6 months
Location: Dos Hermanas (Seville)
Study grants: 1800 euros/month
Availability: To be defined.
Immediate incorporation.
Interested students send CV to: relemp-etsi@us.es indicating Extracurricular Practice INDUSTRIAL SOLUTIONS AND ENVIRONMENTAL TREATMENTS 378741